The Investment Life Cycle Steering Committee (ILC SC) last met on September 23, 2009. As a result, the following updates have occurred: - The Technical Review Board (TRB) will begin conducting Operational Readiness Reviews (ORR) with participation from the Enterprise Data Center Group (EDCG) and the appropriate infrastructure support contractor.
- A new task has been added to the ILC Process as the first step in the Initiation Phase; the task is to send an initial email to the CMS EA_InTake Outlook Resource Mailbox.
- A Project Close Out Template has been added to the ILC as a Non Phase Specific Project Management Artifact.
- The Operations & Maintenance (O&M) Manual has been updated and will now replace the SOMM.
- The System Design Document (SDD) has been updated.
- A Preliminary Design Review (PDR) Template has been added to the template library.
| Downloads | There are no Downloads
| | Related Links Inside CMS | There are no Related Links Inside CMS
| | Related Links Outside CMS |  | There are no Related Links Outside CMS
|
Page Last Modified: 10/14/2009 10:58:46 AM
Help with File Formats and Plug-Ins
Submit Feedback
|